Distribution & Power Transformers
Oil-filled + dry type from Crompton Greaves (CG Power), BHEL, Voltamp, ABB, Schneider, Siemens. Brand-neutral recommendation based on capacity, voltage, and use case.
Indicative pricing Rs 1.5 lakh - 2.8 crore across the full range. Lead time 6-20 weeks brand-dependent.


Indicative Transformer Price Bands by Capacity & Type
Indicative market price for new transformers across capacity tiers and types we supply. Oil-filled is typical for outdoor / yard installation; dry type for indoor / fire-sensitive zones.
| Capacity | Oil-Filled (Outdoor) | Dry Type (Indoor / Fire-Sensitive) |
|---|---|---|
| 25 - 100 kVA | Rs 1.5 - 4 lakh | Rs 2.5 - 6 lakh |
| 100 - 500 kVA | Rs 4 - 15 lakh | Rs 6 - 25 lakh |
| 500 - 1500 kVA | Rs 12 - 40 lakh | Rs 18 - 60 lakh |
| 1500 - 3000 kVA | Rs 35 lakh - 1 cr | Rs 55 lakh - 1.5 cr |
| 3000 - 5000 kVA | Rs 90 lakh - 2 cr | Rs 1.3 - 2.8 cr |
Pricing reflects new transformer market quotes across the brands we supply in 2024-26. Lower end = cost-tier brands and standard accessories; upper end = premium brands (BHEL, ABB) with full accessory pack. Final quote depends on vector group, tap changer (OLTC vs OCTC), cooling type (ONAN/ONAF), and site-specific accessories. For very large units (above 5 MVA) or 66 kV+ class, custom build typically required - timeline 16-24 weeks.
Which Brand We Recommend - And Why
Multi-brand supply with honest brand-fit recommendations. We do not push the brand with the highest margin - we recommend what fits your capacity, budget, lead time tolerance, and any tender requirements.
Crompton Greaves (CG Power)
Premium
Most-supplied brand in our portfolio. Strong build quality, good after-sales service network. Suitable for nearly any commercial/industrial application. Best price-performance balance for buyers under 5 cr budget.
BHEL
Premium PSU
PSU buyer preference. Longer lead times (12-20 weeks) but stamped quality. Required for some government tenders. Higher capex but very strong residual value.
Voltamp
Mid
Strong distribution transformer specialist. Good value in 250-1000 kVA range. Indian manufacturing, faster lead times.
ABB / Schneider / Siemens
International Premium
Choose when international brand reputation matters (foreign-owned facilities, multinational compliance). Premium pricing, longer lead times, premium-tier service. Required for some BMS/SCADA integrations.
Brand availability and lead time vary. Premium brands (BHEL, ABB, Schneider, Siemens) typically have 12-20 week lead times. CG Power and Voltamp typically 6-12 weeks. Smaller distribution units (under 500 kVA) can sometimes ship from stock.
Industry-Specific Transformer Recommendations
Different industries have different transformer requirements - oil vs dry, harmonic handling, redundancy.
Manufacturing / Industrial
250 - 2500 kVA
Oil-filled (outdoor yard install)
Process load + motor starting + lighting. Often 11kV/415V distribution. APFC panel integration common.
Commercial / Real Estate
500 - 1500 kVA
Oil-filled or Dry (indoor basement)
Lift + HVAC + lighting + tenant load. Multi-tower projects often need 2-3 transformers in parallel.
Hospitals / Healthcare
500 - 2500 kVA
Dry type (fire-sensitive)
Critical care + diagnostic equipment + HVAC. Often paired with redundant N+1 setup. Cast resin dry type strongly preferred.
Data Centers / IT Parks
1000 - 5000 kVA
Dry type with K-rated handling
High harmonic load. K-13 rated transformers handle non-linear UPS loads. Often 3-4 units paralleled for Tier III/IV redundancy.
How to Select the Right Transformer
Five decisions in sequence. Skip any and you risk wrong sizing or non-compliance during DISCOM inspection.
Calculate Total Load
Sum all connected loads with starting current considerations. Add 25-30% margin for future expansion. Use IS 8528 methodology.
Choose Voltage Levels
Primary voltage from utility (11/22/33/66 kV typical). Secondary voltage based on equipment (415V / 240V / specialized).
Decide Oil vs Dry Type
Oil-filled = cheaper, outdoor/non-fire-sensitive sites. Dry type = indoor, hospitals, fire-sensitive, no oil leak risk.
Select Vector Group + Tap Changer
Dyn11 is standard for distribution. OLTC (on-load tap changer) for sites needing voltage adjustment without shutdown. OCTC for standard installations.
Plan Installation
Civil foundation, room ventilation per NBC, lightning arresters, earthing, oil containment pit (for oil-filled). Lead times: 6-20 weeks brand-dependent.
Standards We Comply With
Every transformer supply ships with documentation referencing these standards. Required for DISCOM connection approval and Electrical Inspectorate clearance.
IS 1180 (Part 1)
Outdoor type three-phase distribution transformers up to and including 2500 kVA, 33 kV - the workhorse standard for distribution transformers in India
IS 2026 (Part 1-5)
Power transformers - construction, performance, requirements for transformers above 5 MVA
IS 11171
Specification for dry type power transformers (cast resin and others)
IS 12676
Insulating oil and dielectric strength requirements
NBC 2016 Part 4
National Building Code - transformer room ventilation, fire safety, civil setbacks
CEA Regulations 2010
Central Electricity Authority - safety + technical requirements for installations
Installation Requirements
What needs to be ready at your site before transformer delivery. Our installation team coordinates with your civil contractor on these items.
Civil
- Foundation: RCC plinth sized per transformer weight (1-10 tonnes range)
- Oil containment pit (for oil-filled units, capacity = 110% of oil volume)
- Room ventilation per NBC 2016 (natural or forced)
- Setbacks from buildings (3-6 m for outdoor oil-filled)
- Crane access for installation + future maintenance
Electrical
- HV cable termination (11/22/33 kV) with cable boxes
- LV bus duct or cable to main panel
- Lightning arresters at HV side
- Earthing - separate transformer body + neutral earthing pits
- Drop-out fuses + LBS at HV side
Compliance
- DISCOM approval for HV connection
- Electrical Inspectorate (CEIG) inspection + clearance
- Form A submission per CEA Regulations
- Earthing test reports (resistance < 1 ohm typical)
- Insulation resistance test report (Megger) pre-commissioning
We provide a free site survey before order placement to verify civil readiness and electrical preparation. Bridges between your civil contractor and DISCOM filing is included in our scope of supply.
What Our Transformer Supply Includes
A transformer on the truck is not a connection. We deliver the full path to energized.
Pre-supply site survey
Civil + electrical + access verification. BOQ confirmation.
Manufacturer type test reports
Required for DISCOM submission. Routine + type test certificates.
Installation + commissioning
Foundation alignment, HV/LV cable termination, earthing, oil filling (oil-filled units).
Pre-commissioning electrical tests
Insulation resistance (Megger), winding resistance, turns ratio test, oil dielectric strength (oil-filled).
DISCOM coordination support
We coordinate with your DISCOM for HV connection, Form A submission, CEIG inspection.
Lightning arresters + drop-out fuses
HV protection package included for outdoor units.
1-year warranty
Manufacturer warranty (typically 2-3 years on workmanship + 1 year on accessories).
Annual maintenance contract option
Oil sampling, breather replacement, insulation tests bundled if you opt for AMC.
Continue Exploring Alpha Diesels
Authorized Greaves Cotton (diesel generators) and Kirloskar Pneumatic (air compressors) dealer. 25+ years serving North India.
Related Products
Service and Support for This Range
Available Across Industrial North India
Frequently Asked Questions
Common questions about distribution and power transformers
Still Have Questions?
Our team is ready to help you with any queries
Get an Indicative Transformer Quote in 2 Hours
Share your capacity, voltage, and installation type on WhatsApp. We respond with indicative pricing, lead time, and brand options matched to your use case.